News

Brisbane Airport Successful Completion

Please click the below link to view our latest news on the successful completion of the Brisbane Airport Project

Brisbane Airport Completion

Bruce Highway Managed Motorways

Bruce Highway Managed Motorways

Perfect Earth provided soil amelioration, soil placement, soil stabilisation, turf and hydromulch for their client, BMD Constructions.  

Read more

Regatta Waters Fairway Construction, Airlie Beach

Regatta Waters Fairway Construction, Airlie Beach

This project consists of 3.5 hectares of Fairway construction at Regatta Waters, Airlie Beach The addition of site rocks mixed throughout the topsoil created a possible hazard for golfing enthusiasts. Perfect Earth was contracted to thoroughly combine ameliorants and bury rocks and to provide a finished surface […]

Read more

CPESC Accreditation

CPESC Accreditation

Perfect Earth’s Managing Director achieves CPESC Accreditation Perfect Earth’s Managing Director, Marcus Koolen, has achieved accreditation as a Certified Professional in Erosion and Sediment Control (CPESC). Benefits to our clients include: Provides compliance to project contracts Proficiency in the erosion and sediment control field Assures our clients […]

Read more

Wesfarmers Curragh, Blackwater

Wesfarmers Curragh, Blackwater

Perfect Earth’s project at Curragh included 28 hectares of batter stabilisation of the levee banks surrounding the Curragh coal mine at Blackwater, between Emerald and Rockhampton. The batters were stabilised by hydromulching with Hydro Blanket Plus that also contained a mix of specified grass seeds and a […]

Read more

Newbase Brendale Drainage Reserve

Newbase Brendale Drainage Reserve

Our Brendale project consists of 2 retention basins including surrounding areas and embankments. Perfect Earth are doing initial weed control to reduce the weed seed bank in the areas that are to be worked. These areas then have the soil ameliorated by the use of various spreading […]

Read more

Soil Amendments Newsletter

Soil Amendments Newsletter

Nutrient testing must be considered as compulsory prior to adding any amendments or nutrients…. Nutrient Testing, Soil Amendments and Amelioration Nutrient Testing Factual test results provide evidence of actual requirements to amend soils which sustain plant life. This point is often overlooked and results in failure of […]

Read more

GLNG – Working in conjunction with Saipem Australia

GLNG - Working in conjunction with Saipem Australia

Perfect Earth has recently completed the translocation of over 800 Cycas Megacarpa between Gladstone and Injune for Saipem Australia. The works were specifically for the efficient translocation of Cycas megacarpa individuals and clusters from the GLNG Transmission Gas Pipeline Right of Way (RoW) to a pre-determined temporary […]

Read more

Winners of Sunshine Coast Business Awards 2013

Winners of Sunshine Coast Business Awards 2013

Perfect Earth are very proud to announce they have won the Environmental Industry Large Business Award 2012 and 2013 – 2 years running. We thank all our valued team members, consultants and clients for this achievement.

Read more

NEW Hydromulch Truck

NEW Hydromulch Truck

NEW – Off/On Road 8 Wheel Drive Hydromulch Truck This mine spec truck is now available to use. Built with safety in mind it includes: Drivers monitor – Cameras positioned to view: reversing, cab mounted passenger side view, cab mounted front view and tank mounted operator view. Full mine […]

Read more

Spontaneous combustion in mine sites

Spontaneous combustion in mine sites

Perfect Earth was employed to provide a trial on a coal mine site where spontaneous combustion had occurred The situation: Due to wet weather, spontaneous combustion had occurred in the mine site spoil, forcing the mine to close due to gasses being released into the atmosphere. The mine […]

Read more

Spray on ditch lining

Spray on ditch lining

Perfect Earth is now installing long life spray on ditch lining – for clean water diversions, stabilising batters etc. This system is currently used in Transport and Main Roads, Sunshine Coast Regional Council, Land Development Stabilisation and Landfill Cell Construction.

Read more

New CAT 299C with tilt hitch for Perfect Earth

New CAT 299C with tilt hitch for Perfect Earth

Perfect Earth are now operating a CAT 299C with tilt hitch, 4 in 1 bucket, slasher and spreader bar. Includes blue tooth UHF, FOPS, ROPS and enclosed cabin.

Read more
Page 1 of 3123

Our Clients Include

logo-vdm logo-shadforths logo-scc logo-saipem logo-fkg logo-clough Eureka-Logo
logo-bechtel logo-mccosker logo-mcconnell logo-hall Roadtek-Logo NWC Logo

Contact Us

Call Head Office:
General Enquiries:
Accounts & Billing:
Quotes & Estimates:
07 5476 6298
frontdesk@perfectearth.com.au
accounts@perfectearth.com.au
estimating@perfectearth.com.au

Awards & Associations